Skip to main content

Renovation and Building-Improvement Services

Explore residential and commercial renovation services organized around existing conditions, building requirements, coordinated planning and the sequence required to complete the work.

What to Expect When Planning Construction Work

Renovation planning begins with the property, the intended use and the conditions that can affect design, approvals, sequencing and access. Kellets coordinates the documented scope, selections, building requirements and construction stages so owners can understand what information is needed before work begins and what decisions must be made as the project advances.

How Kellets Organizes Renovation Work

Coordinated Project Planning

The project path is organized around documented scope, decisions, site access, required approvals, sequencing and communication.

Building-Performance Options

Where relevant, envelope, insulation, ventilation, heating, cooling and material options are evaluated against the conditions and goals of the property.

Documented Communication

Project updates, decisions, questions and changing conditions should be documented so the owner and project team can respond with the same information.

How the Work Is Structured

Property-Specific Project Plans

The working plan is developed from the agreed scope, property conditions, building requirements, selections and known constraints.

Methods Matched to the Work

Tools and methods are selected for the material, access, existing conditions and required sequence.

Project-Specific Materials

Materials are selected and documented for their intended location, performance requirements, compatibility, maintenance and finish.

Documented Quality Checks

Required checks, observations and closeout records are tied to the applicable work stage and project requirements.

Resource and Performance Considerations

Where applicable, the project can evaluate waste reduction, material choices, air sealing, insulation and building-system performance.

Transparent Communication

Regular updates identify completed work, upcoming decisions, open questions and conditions that may affect the plan.

Our Services

Depending on the property and scope, renovation work may require coordination among owners, building management, designers, licensed trades, consultants, inspectors and other responsible professionals.

What to Expect Before Construction Begins

Reach out to us for an initial consultation where we discuss your needs, goals, and project specifics. We'll conduct a thorough assessment to understand your vision and requirements.

Based on the consultation, we develop a detailed, tailored plan that outlines the scope, timeline, and budget for your project, ensuring all your needs are addressed.

Our skilled professionals implement the plan using advanced techniques and high-quality materials, maintaining transparent communication and real-time updates throughout the process.

Upon project completion, we conduct a final inspection to ensure everything meets our high standards and your expectations. We provide ongoing support and warranties to ensure long-term satisfaction and peace of mind

What Our Clients Say About Kellets

Mai Joaquin

What I would like to share regarding my experience working with Kellets Home Improvement is that the job was completed in a timely matter with nothing short of perfection from beginning to end. What I appreciated the most is the daily updates and open/clear communication I had with the company. They sent me daily videos/photos and I knew exactly how the job was going each day. Although I had a clear idea of what I wanted done, they opened my eyes to different designs and options I didn’t know existed. There were no hidden fees and they respected my budget I had put in place. Their patience, professionalism, and care that they put into the job will not be forgotten and I’ve already shared Kellets with family and friends who felt the same way. Thank you Kellets!

Mai Joaquin

Mai Joaquin

What I would like to share regarding my experience working with Kellets Home Improvement is that the job was completed in a timely matter with nothing short of perfection from beginning to end. What I appreciated the most is the daily updates and open/clear communication I had with the company. They sent me daily videos/photos and I knew exactly how the job was going each day. Although I had a clear idea of what I wanted done, they opened my eyes to different designs and options I didn’t know existed. There were no hidden fees and they respected my budget I had put in place. Their patience, professionalism, and care that they put into the job will not be forgotten and I’ve already shared Kellets with family and friends who felt the same way. Thank you Kellets!

Mai Joaquin

Frequently Asked Questions

What areas do you serve?

Kellets serves projects in Westchester County and New York City. Service availability depends on scope, building requirements, logistics and scheduling for the specific property.

What type of projects do you specialize in?

The service paths include kitchens, bathrooms, basements, additions, carpentry, painting, facades, roofs, waterproofing, windows and building-system upgrades. The applicable path depends on the property, scope and required approvals.

How do you ensure project quality and satisfaction?

Quality control is organized through documented scope, selections, stage-specific checks, open-item tracking and closeout records appropriate to the work. Required inspections depend on the property, permit and project scope.

What sustainable practices do you implement?

Where relevant, a project can evaluate insulation, air sealing, ventilation, heat pumps, controls, windows and other building-performance measures. Recommendations and incentive eligibility depend on current rules and documented property conditions.

Discuss Your Project

Share the property, the work you are considering, known constraints and any available drawings or building requirements. Kellets can help organize the next planning conversation and identify the information required before scope, pricing and schedule can be confirmed.

    Answer-first planning

    Which renovation guide should you start with?

    Start with the condition, building type or finish that controls the work. These answers route you to the deeper guide without pretending that every renovation follows the same sequence.

    I am renovating a private house. Where should planning begin?

    Begin with the full scope and the systems it may disturb—not only the room you want to see finished. A whole-home or design-build plan should identify existing conditions, permit and professional needs, long-lead selections, temporary protection and the order in which structure, utilities, envelope and finishes must proceed.

    Start with whole-home renovation or design-build remodeling. If the scope is limited to one room, use the kitchen or bathroom guide.

    What changes when the property is a co-op or condominium?

    The building's alteration agreement can control working hours, insurance, protection routes, elevator reservations, plumbing shutdowns, noise, debris removal and required submissions. Those building rules must be coordinated with the design and construction sequence before scheduling work.

    Use the NYC co-op, Westchester co-op and apartment bathroom guides.

    Water is entering the basement or building envelope. Is this a finishes project?

    Not until the water path is understood. Roof drainage, grading, wall transitions, penetrations, cracks, foundation drainage and interior humidity can produce similar symptoms but require different responses. Covering a damp surface before diagnosing the source can conceal continuing damage.

    Start with foundation waterproofing and the building-envelope guide.

    Cracking, settlement or sagging is visible. Which path applies?

    Document the condition before finishes are removed or rebuilt. The appropriate professionals must determine what investigation and design information are required. Temporary support, selective excavation, structural work, drainage and service access may need to be sequenced together.

    Use the structural repair and underpinning guide. The carriage-house case study illustrates why those work stages are treated as one coordinated operation.

    Should insulation or new heating and cooling equipment come first?

    Comfort complaints can involve air leakage, insulation gaps, moisture, ventilation, distribution or equipment sizing. Envelope conditions and expected loads should be evaluated before equipment decisions are treated as isolated replacements. Incentive eligibility also depends on current program rules and the specific property.

    Start with insulation and air sealing or multifamily energy-upgrade planning.

    What should be resolved before high-end wallpaper is ordered?

    Confirm substrate condition, wall preparation, primer and adhesive requirements, roll dimensions, pattern repeat, dye-lot consistency, seam planning and the treatment of corners, openings and transitions. Installation quality depends heavily on what happens before the first strip is hung.

    Use the high-end wallpaper installation guide.

    Planning boundary: These answers organize the next conversation. Final scope, pricing, schedule, code requirements, professional responsibilities and incentive eligibility depend on current rules and documented property conditions.

    Renovation Knowledge Center

    What to expect when you’re expecting a renovation

    Start with the work you are considering. Each guide answers the planning, sequencing, material, building-rule and field-condition questions owners should understand before construction begins.

    The guides are educational starting points. Final scope, pricing, schedule, code requirements and incentive eligibility depend on current program rules and the conditions documented at your property.