Skip to main content

Basements · Foundations · Waterproofing · Westchester + NYC

Find the water.Protect the structure. Rebuild with confidence.

Kellets investigates moisture and foundation conditions, coordinates the right water-management and repair strategy, documents the work, and can carry a dry basement through to a finished living space.

Hero image: real Kellets exterior waterproofing work. No stock photography.

Start with the condition

“A basement should not be rebuilt until the water path, structural condition and intended use are understood together.”

One accountable path from investigation to closeout.

Water at the wall, floor, crack or joint can have different causes. Kellets begins with what the building is showing—not a one-size-fits-all product—and develops the scope around access, drainage, structure, utilities and the client’s finished-space goals.

Exterior waterproofingInterior drainageFoundation repairSump strategyHumidity controlBasement remodeling

What are you seeing?

Choose the condition closest to yours.

Photos, timing and location help us prepare for the first conversation. An on-site assessment confirms the method.

01 · Water entry

Wet wall, floor or joint

Document when it appears, how far it travels and what happens outside during the same weather.

Explore water-management methods →

02 · Movement

Crack, bowing or settlement

Structural symptoms deserve measured observation and, where appropriate, coordination with the design professional.

Review structural repair guidance →

03 · Air and moisture

Musty odor or high humidity

Moisture sources, ventilation, dehumidification and enclosure conditions should be evaluated together.

Read moisture-control answers →

04 · New living space

Finish or remodel a basement

Water management, insulation, egress, utilities and permits come before finishes and furniture.

See basement remodeling planning →

How Kellets approaches the work

Diagnose, plan, protect, document and close.

The exact sequence changes with the building, but accountability should remain visible throughout.

01 · VERIFY

Inspect conditions

Review water paths, cracks, grading, roof runoff, utilities, finishes and access constraints.

Inspection questions →

02 · DEFINE

Build the scope

Separate assumptions from confirmed work and identify design, permit and procurement needs.

Compare the methods →

03 · PROTECT

Prepare the site

Plan excavation, interior protection, occupied-building coordination and safe access.

Watch site preparation →

04 · PERFORM

Install and repair

Coordinate drainage, membranes, pumps, crack repair, structural work and restoration.

See real installations →

05 · SHOW

Document closeout

Share progress photos, video, inspection information, punch-list status and the project record.

How we communicate →

5 seconds of real field context

See the foundation perimeter—not a product diagram.

This short Kellets field clip documents the stone base, foundation edge, active site conditions, and the person explaining the work. It helps a client understand what “preparation” looks like without pretending every building receives the same system.

Playback is always client-controlled. The video does not autoplay and should be paired with a concise transcript or caption when published.

Methods selected to fit the building

No single product solves every water problem.

The recommended system follows the observed condition, access and intended performance.

Exterior waterproofing

Excavation, substrate preparation, membrane, drainage/protection layers, perimeter water management and restoration where exterior access is appropriate.

View a foundation case study →

Interior drainage

Perimeter or localized collection strategies coordinated with slab, wall, sump and discharge conditions.

Interior drainage Q&A →

Sump and backup strategy

Pump capacity, basin, discharge route, check valves, alarms and backup planning considered as a system.

Sump-system Q&A →

Crack and joint repair

Repair approach based on crack type, movement, water path and structural context—not appearance alone.

Structural repair guidance →

Humidity and enclosure

Drainage, air sealing, insulation, ventilation and dehumidification coordinated to reduce avoidable moisture load.

Humidity-control Q&A →

Basement remodeling

Layout, utilities, insulation, egress, code, finishes and storage planned after the water and structural strategy is clear.

Plan the finished space →

Important: examples describe capabilities, not a diagnosis. Kellets confirms the appropriate scope after reviewing the actual building and available reports.

Completed Kellets basement living space with custom media wall

Dry first. Finish second.

Waterproofing and remodeling belong in one plan.

A finished basement succeeds when enclosure, drainage, structure, mechanical systems, electrical work, access and daily use are coordinated before walls close.

Kellets can connect the investigative work to procurement, field supervision and the finished renovation so responsibility does not disappear between specialties.

Discuss a basement remodeling project

Communication is part of the scope

Clients should see what is happening behind the finished wall.

Field supervisor reviewing plans while Kellets team and trade partners work inside an open framed space
Field supervision with Kellets team and trade partners · real project image

Procurement led by Frank

Scope, vendor and material decisions organized before they become field delays.

Field supervision

A field supervisor or foreman coordinates the daily site sequence and raises conditions that require a decision.

Daily notices from Lanna

Clear notices support access, milestones and the client’s understanding of what comes next.

Shared WhatsApp group

A project-specific communication channel keeps key participants connected.

Photo and video updates

Progress and concealed conditions are documented throughout the work.

Inspection information

Relevant reports and inspection outcomes are organized into the project record.

Frequently asked questions

Clear answers before work begins.

What is the difference between damp proofing and waterproofing?

Damp proofing is generally intended to resist soil moisture, while waterproofing is designed to resist liquid water under more demanding conditions. The existing assembly and actual water pathway determine which approach is relevant.

Why does my basement leak only during heavy rain?

Heavy or wind-driven rain can overwhelm drainage, saturate soil, raise groundwater, expose a grading problem or direct roof runoff toward a crack or penetration. The timing is valuable diagnostic evidence.

Can gutters and grading really solve basement water?

Sometimes. The EPA notes that basement moisture may be corrected by redirecting downspout runoff or regrading, while more extensive conditions may require excavation and waterproofing. Diagnosis should precede a major system.

Is an interior drainage system the same as waterproofing outside?

No. Exterior work aims to keep or redirect water before it crosses the foundation; interior drainage manages water that reaches the inside perimeter and carries it to a discharge point. Each has different access, cost and performance considerations.

When is a sump pump appropriate?

A sump system may be appropriate when subsurface water must be collected and discharged. Basin location, pump capacity, check valve, discharge route, power reliability, backup and maintenance all require planning.

Can a foundation crack simply be sealed?

Some non-moving cracks may be candidates for localized repair, but the crack type, width, movement, water pressure and structural context must be understood. A structural concern should be reviewed by a qualified engineer.

Is the white powder on my basement wall mold?

Often it is efflorescence, a mineral deposit left as moisture moves through masonry, but appearance alone is not a complete diagnosis. The moisture source still needs attention, and suspected biological growth should be assessed appropriately.

Should I finish the basement immediately after waterproofing?

Allow time to verify performance under relevant weather or operating conditions and confirm that affected assemblies are dry before installing moisture-sensitive finishes.

Do you waterproof from the inside or outside?

Kellets evaluates both. The right approach depends on the source, foundation type, site access, landscaping or hardscape, groundwater, planned use and whether an interior collection system is acceptable.

What information helps during the first inspection?

Photograph the area during or immediately after the event, note rainfall timing and duration, mark the water limits, record pump operation, and gather prior repair or drainage information. Do not cover or clean away all evidence before inspection.

Will waterproof paint stop an active basement leak?

A coating may reduce surface dampness in limited conditions, but it does not correct exterior runoff, hydrostatic pressure, an open crack, a failed penetration or a plumbing source. Coating over an active pathway can hide the symptom temporarily while water continues affecting the masonry or adjacent materials.

How can I tell condensation from foundation seepage?

Condensation usually tracks indoor humidity and cold surface temperature, while seepage often follows rain, snowmelt, groundwater conditions or a repeatable entry point. Hygrometer readings, weather timing, material moisture patterns and inspection of pipes and equipment help separate the causes.

Where should a sump pump discharge?

The discharge must follow local requirements and move water to an approved location where it will not return to the foundation, create ice or affect neighboring property. Routing, lift, pipe size, check valve, freeze protection and the final outlet are designed as one system.

Does a sump pump need backup power?

If the basement is vulnerable during storms, backup power or a secondary pump deserves serious consideration because utility outages can occur when groundwater and rainfall are highest. Capacity, battery maintenance, alarms and the expected run time should be documented rather than assumed.

What happens during exterior foundation waterproofing?

The sequence can include protection and access planning, controlled excavation, cleaning and repairing the foundation, installing the specified membrane and protection or drainage layer, coordinating footing drainage, then placing suitable backfill and restoring grade. Excavation safety, utilities and adjacent structures must be addressed before work begins.

Should wet insulation and drywall stay in place?

Materials that remain wet, contaminated or unable to dry may require controlled removal. The water source must be stopped, concealed cavities inspected, and the assembly dried and cleaned appropriately before replacement. Closing a damp cavity can preserve odor, deterioration and microbial risk.

Why test the repair before rebuilding the basement?

The repair should be observed under relevant rain, drainage, pumping or controlled test conditions whenever practical. At the July-August 2026 bathroom-and-envelope investigation used in our field training, repeated water testing and additional selective openings were required before wet insulation and drywall could be replaced.

What should a waterproofing proposal clearly include?

It should identify the diagnosed or suspected pathway, access and protection, demolition, excavation if any, crack or penetration work, membrane or drainage products, sump equipment, discharge route, restoration limits, testing, exclusions and how concealed conditions will be documented and priced.

Can Kellets coordinate foundation and concrete repairs with the waterproofing work?

Yes, when the work falls within the applicable licensed and permitted scope. Kellets coordinates excavation, concrete and foundation repairs with the water-management sequence; conditions requiring structural design are referred to the appropriate engineer or design professional.

Can Kellets remodel the basement after the water problem is addressed?

Yes. Waterproofing, utilities, insulation, egress and finish work should be planned together, but moisture-control performance must be checked before vulnerable finishes conceal the foundation and wall assemblies.

How does procurement work during a Kellets project?

Frank leads procurement coordination with the project team. Specified products, lead times, substitutions, delivery conditions and approval needs are tracked against the work sequence so field decisions remain connected to the agreed scope.

How will I receive updates during construction?

The project communication plan can include a shared WhatsApp group, field-supervisor updates, photographs and video, relevant inspection reports, and daily notices coordinated by Lanna. The exact participants and cadence are confirmed during project setup.

What should I send before the first conversation?

Send the property address, when and where water appears, photographs or video, recent storm timing, available drawings or inspection reports, prior repair information, and whether the basement is occupied or planned for finishing.

Start with evidence

Tell us what the building is showing.

Send the address, timing, photographs, video, drawings or inspection reports you already have. We will help define the next useful step.